The Wall My Neighbor Wanted Gone

The Fellowship Hall

I called for an emergency HOA meeting the following Monday, and word travels fast enough on twelve houses that every single one of them showed up, folding chairs pulled into a tight half circle in the fellowship hall behind the church out on Route 5, the same building where Norm used to serve coffee on Sunday mornings.

I read the report out loud, page by page, and I watched Rita’s face change somewhere around the fourth page, the confident tilt of her chin dropping by degrees as I got closer to the section about her own excavation. By the time I read the recommendation on the last page, the room had gone dead quiet, the kind of quiet that only happens when everybody present has just done the same math at the same time.

Melissa, the widow who had spoken up for me at the first meeting, asked the question that mattered most. Had Rita’s own contractor ever mentioned any of this to her, before the violation notice went out.

Rita did not answer right away. Somebody else in the room, one of the newer neighbors who had installed a similar pool the year before, mentioned that Rita’s contractor was the same one who had done his own project, and that the man had a reputation locally for cutting corners on permits to keep his bids low. It came out, slowly, through a few more questions, that the contractor had in fact warned Rita weeks earlier that the excavation was closer to the slope than he was comfortable with, and that she had told him to keep going, that the wall next door was coming down soon anyway and would make the whole corner easier to finish properly.

She had known there was a risk. She had pushed forward regardless, and she had pushed the fine against my wall through the board at the same time, whether to clear the way for her own project or to have something to point to if her excavation ever caused a problem, I honestly could not say and did not care to guess out loud in that room. The board did not need me to say it anyway. They had already heard enough.

What The County Found And What Rita Lost

The county building inspector came out that same week, alerted by a copy of the engineering report my attorney filed alongside a formal complaint. He confirmed within an afternoon what the report had already told us. No permit had ever been pulled for the pool excavation, no engineering review had been filed for work that close to a known unstable slope, and the drainage rerouting violated at least two sections of the county’s stormwater code.

Rita’s project was halted on the spot, a bright orange stop work order zip tied to her fence post where the whole street could see it from the road. The county required a full engineering remediation plan before any further work could proceed, at her own expense, along with fines for the unpermitted excavation that ran well past what she had ever threatened to charge me.

Word of it made its way around town faster than I expected, which in a place the size of Mountain Home is not saying much. By the following Saturday, the regulars at the diner on the square knew the whole story before I had even ordered my coffee, and the waitress who had poured it for me every week for a decade set the cup down and told me, low enough that only I could hear, that she had always figured that new woman on the Ridge was going to run into something she could not talk her way out of. Somebody at the feed store asked me, half joking, whether I planned to bill Rita for the consulting she never listened to. I told him I would settle for her not making me hire a lawyer again anytime soon.

The HOA board met again ten days later and voted, this time five to zero, to formally rescind every dollar of the fine against my property and to amend section fourteen so that any retaining structure carrying a current engineer’s certification would be permanently exempt from the materials and aesthetics clause, regardless of what it was built from. Rita resigned the presidency before anyone had to ask her to. She did not attend that meeting, and nobody seemed surprised.

I heard through Melissa, a few weeks after, that Rita’s remediation bill from the county’s approved engineering firm came in well north of forty thousand dollars, more than double what a properly permitted pool project would have cost her from the start, before you even counted the fines.

Leave a reply

Your email address will not be published. Required fields are marked *